Lorem Ipsum is simply dummy text of the printing and typesetting industry. search for will uncover many web sites still.

Gallery

Contact Info

This project involved utility repair work, including the installation of graded aggregate base (GAB) and asphalt topping. A total of 18 tons of asphalt topping and 4 tons of 8-inch GAB were used to cover an area of 45 square yards. The project was completed in a single day. This undertaking was particularly unique due to a water main break in the middle of a main road, which caused a significant portion of the road to be shut down. The urgency of the situation required us to adjust our schedule promptly to ensure the road could be reopened for the client’s property as quickly as possible.

post-img
Prev post

Why Asphalt is the Preferred Choice for Commercial Parking Lot Paving

Next post

Hiram High School Football Stadium and Concessions Paving Project

post-img