The recent project at Starr’s Mill High School focused on the comprehensive resurfacing of the student parking lot. The scope of work included milling the existing asphalt to a depth of 2 inches and then applying a new 2-inch layer of 9.5mm asphalt topping. In addition to these primary tasks, the project required re-striping the parking lot to replicate the existing layout. The paving effort was meticulously planned and executed to ensure that the parking lot was fully restored to meet the school’s needs.

The project involved significant quantities of materials and demonstrated impressive efficiency in execution. Specifically, a total of 2,482 tons of asphalt topping was used for the resurfacing process. Although the exact quantities of sealer and crackseal are unspecified, these materials were integral to the completion of the project’s scope. The work was structured in a series of well-coordinated phases: the milling was completed over a period of 2 days, the paving was accomplished in another 2 days, and the re-striping, which covered 20,565 linear feet, was finalized in just one day.

What made this project particularly noteworthy was the tight deadline and the team’s ability to meet and exceed expectations. Awarded on July 2nd with an original completion deadline of August 1st, the project was initiated on July 8th and successfully completed on July 14th. This accelerated timeline was met through strategic planning and efficient operations. Notably, on the second day of paving, the crew achieved an impressive milestone by laying 1,490 tons of asphalt in a single day. Furthermore, the entire striping task, which was a substantial component of the project, was efficiently completed in just one day.

Overall, the successful execution of the Starr’s Mill High School parking lot resurfacing project was a testament to the team’s expertise, planning capabilities, and ability to deliver high-quality results within a constrained timeframe. The project not only met but exceeded the initial expectations, showcasing a high level of professionalism and dedication from all involved.